Product Details:
Payment & Shipping Terms:
|
Application: | Construction Crane Loading | Max.lifting W: | Weight: 3000kg |
---|---|---|---|
Max.lifting H: | Height: 26m-30m | Cell: | 8615271357675 |
Size: | 8.75*2.23*2.8m | HS Code: | 8705102100 |
High Light: | truck mounted hydraulic crane,vehicle mounted crane |
Hydraulic Truck Crane 3 Ton Lifting Mobile Truck Tricycle crane-3ton crane
Sepcification of our truck crane
Maximum lifting load : 5-12 Ton
Maximum lifting height: 20m-34meter
Chassis brand can be choose:Dongfeng / Tking / BMC / Foton or Self made chassis
Emission standard: Euro IV or Euro V , as your requirement
Technical Data
Item name | 6 ton | 8 ton | 10 ton | 12 ton |
Announced chassis | TKING | TKING | TKING | TKING |
Overall dimension(MM) | 9454*2140*2980 | 10100*2180*3140 | 9700*2300*3180 | 9970*2340*3180 |
Max.loading capacity(kg) | 6000 | 8000 | 10000 | 12000 |
Max.lifting height(m) | 24 | 28 | 31 | 34 |
Outrigger system | Full hydraulic automatic vertical and horizontal cylinder telescopic H outrigger | |||
Braking form | Break air brake form | |||
Steering form | Hydraulic power steering form | |||
Crane jib structure | 4 or 5section octagonal arm, oil cylinder arm out | |||
Boom type | Straight arm,telecopic boom,U-shape | |||
Main Lifting Mechanism | Category two planet wheel with a brake inside | |||
Auxiliary Lifting Mechanism | Category one gear brake motor | |||
Swing Bearing | Internal gear turntable made of 50 manganese steel | |||
Vertical hydraulic leg | Double-acting engineering oil cylinder | |||
Horizontal hydraulic leg | Double-acting engineering oil cylinder | |||
Platform | Anti-skidding and big | |||
Protective Screening | Two-way | |||
Night light | 3 lamps control | |||
Crane Cab | Compeletely digital design,luxury driving cab | |||
The central axially symmetrical | Four oil ways | |||
Crane Start | Tailor-made | |||
Throttle | Hydraulic | |||
Pressure gage and switch | Shockproof component | |||
Power takeoff | Driving indoor operation | |||
Hydraulic Oil Tank | Turntable rearmounted, counter weight combined type, special four-layer filters | |||
Max .gradeability | 40% | |||
Ration angle | 360° | |||
Arm elevation | 90° |
Serial number | specification | Total height | Vehicle chassis | Crane / Yuan | Chassis / element | Remarks | |
1 | 6.0T | Section 5 | T.KING EURO three | 58000 | 43000 | Oil and electricity dual-use, | |
26 meters | 490 (588) | ||||||
outer rope | 750-16 tires | ||||||
2 | 6.0T | Section 5 | T.KING EURO four | 58000 | 60000 | Oil and electricity dual-use, | |
26 meters | 490 (588) | ||||||
outer rope | 750-16 tires | ||||||
3 | 8T-A | Section 5 | T.KING EURO three | 71000 | 54000 | Oil and electricity dual-use, | |
28 meters | 4100 (688) | ||||||
outer rope | 825-16 tires | ||||||
4 | 8T-A | Section 5 | T.KING EURO four | 71000 | 74,000 | Oil and electricity dual-use, | |
28 meters | 4100 (688) | ||||||
outer rope | 825-16 tires | ||||||
5 | 8T-B | Section 5 | T.KING EURO three | 85,000 | 64000 | Oil and electricity dual-use, | |
30 meters | 4102 (698) | ||||||
outer rope | 825-20 tires | ||||||
5 | 8T-B | Section 5 | T.KING EURO four | 85,000 | 86000 | Oil and electricity dual-use, | |
30 meters | 4102 (698) | ||||||
outer rope | 825-20 tires | ||||||
6 | 10T | Section 5 | T.KING EURO three | 95000 | 64000 | Oil and electricity dual-use, | |
31.5 m | 4102 (698) | ||||||
outer rope | 825-20 tires | ||||||
7 | 10T | Section 5 | T.KING EURO four | 95000 | 86000 | Oil and electricity dual-use, | |
31.5 m | 4102 (698) | ||||||
outer rope | 825-20 tires | ||||||
8 | 10T | Section 6 | T.KING EURO three | 100000 | 64000 | Oil and electricity dual-use, | |
34 meters | 4102 (698) | ||||||
outer rope | 825-20 tires | ||||||
9 | 10T | Section 6 | T.KING EURO four | 100000 | 86000 | Oil and electricity dual-use, | |
36 meters | 4102 (698) | ||||||
outer rope | 825-20 tires | ||||||
10 | 12T | Section 5 | T.KING EURO three | 105000 | 67000 | Oil and electricity dual-use, | |
31.5 m | 4105 (898 wheelbase 4.3 m | ||||||
outer rope | 825-20 tires | ||||||
11 | 12T | Section 5 | T.KING EURO four | 105000 | 96000 | Oil and electricity dual-use, | |
31.5 m | 4105 (898 wheelbase 4.3 m | ||||||
outer rope | 825-20 tires | ||||||
12 | 12T | Section 6 | T.KING EURO three | 110000 | 67000 | Oil and electricity dual-use, | |
36 meters | 4105 (898 wheelbase 4.3 m | ||||||
outer rope | 825-20 tires | ||||||
13 | 12T | Section 6 | T.KING EURO four | 110000 | 96000 | Oil and electricity dual-use, | |
36 meters | 4105 (898 wheelbase 4.3 m | ||||||
outer rope | 825-20 tires | ||||||
14 | 12T | Section 5 | T.KING EURO four | 125000 | 99000 | Oil and electricity dual-use, | |
35 meters | 4105 (998 wheelbase 4.5 m) | ||||||
innerthe rope | 900-20 tires | ||||||
15 | 16T | Section 5 | DongfengEURO four | 165000 | 130000 | Oil and electricity dual-use, | |
36 meters | 4110 | ||||||
innerthe rope | 900-20 tires |